Fife Park offers modern accommodation completed in September 2015.  It is conveniently located for the University Sports Centre and various Science buildings on the North Haugh.

Fife Park offer the feel of private accommodation, with the comfort of knowing that support, help and advice is available when needed. Neighbouring DRA offers communal facilities for Fife Park, including its own bar.

  • FP_site
  • FP_siteview
  • Fife Park Bathroom
  • Fife Park Bedroom
  • Fife Park Kitchen

Overview

  • Furnished single bedroom in self-catered residence
  • Shared kitchen and bathroom facilities
  • Communcal facilities are located in neighbouring David Russell Apartments and include computer room, activities room, music room, common room, laundry facilities and a bar.
  • Car parking available
  • Bed sizes are 3' 6" (106cm). Double sized duvet and flat sheet recommended in the following buildings: Monaid, Riggs, Kilrule, Muckross, Chariots, Cathedral.
  • Bed sizes are 3' single bed size in the following buildings: Garrett, Sellars and Dunlop

Options

  • Single rooms: 205
  • 2019-20 only Postgraduate: 175
  • 2019-20 only Undergraduate on standard catered basis: 30 

Residence fees 2019/20

Remedial work Fife Park buildings: Cathedral, Chariots, Muchross, Kilrule, Riggs and Monaid

As a defect has been discovered in the design of the above shower rooms, small leaks under shower trays, the University is working with a contractor to rectify these defects.  While it doesn't affect the working order of the showers, remedial works will have to be carried out.  The work will take 2 weeks per flat and there will be a level of noise disruption.  The timing of the works and further details will be communicated to the occupants of the flat in advance.

 

 

Construction of new secondary school

Plans have been approved for the new secondary school in St Andrews which will be constructed in the fields between David Russell Apartments,Fife Park and Andrew Melville Hall.  Ground work is currently being carried out, before construction begins in late summer 2019.  The likely completion will be in early 2021

As we are advised on the construction timeframe we will update this page.

Update September 2019 - Works to be progressed over next 4 weeks

  • Top soil movements
  • Cut and fill earthworks
  • Soil stabilisation
  • Capping to formation levels
  • Surface water mitigation works
  • External drainage works
  • Piling works until mid October
  • Excavate and construct foundations
  • Structural steelwork to Energy Centre